Borehole Materials - Search results
Bore name | Material type | Set name | Top depth (m) | Base depth (m) |
---|---|---|---|---|
CHANNEL TUNNEL RAIL LINK PHASE II A2 OTHER NAME= | DRILLCORE | 10.5 | 61.4 |
Bore name | Material type | Set name | Top depth (m) | Base depth (m) |
---|---|---|---|---|
CHANNEL TUNNEL RAIL LINK PHASE II A2 OTHER NAME= | DRILLCORE | 10.5 | 61.4 |